9
Reference Manual
00809-0100-4001, Rev JA
Section 2: Installation
November 2012
Installation
2.7 HART installation flowchart
Figure 2-1. HART installation flowchart
START HERE
Bench
Calibration?
Field Install
No
Set Units
(page 52)
Set Range
Points
(page 53)
Set Output Type
(page 52)
Set Damping
(
page 57)
Verify
Apply Pressure
Yes
Within
Specifications?
Yes
No
Refer to
Section 4:
Operation and
maintenance
Configure Security
and Alarm
(page 20)
Mount
Transmitter
(
page 10)
Wire Transmitter
(pages 23–31)
Power
Transmitter
(
page 25)
Check Process
Connection
(page 16)
Trim Transmitter
for Mounting
Effects
(
page 76)
Done
Review
Transmitter
Configuration
(
page 42)
Confirm
Transmitter
Configuration
(
page 42)
Configure
Comments to this Manuals