Emerson Liebert APS Installation Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 49
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
Chapter 1 Installation 11
Liebert APM Modular UPS User & Installation Manual
1.7.2 BCB Port
J6 is the battery circuit breaker (BCB) port. The port is shown in Figure 1-6 and described in Table 1-9.
J6
OL
GND
FB
DRV
12V
12V
12V
Figure 1-9 BCB port
Table 1-6 BCB port description
Position Name Description
J6.1 DRV BCB driver signal – (reserved)
J6.2 FB BCB contact state – (reserved)
J6.3 GND Power GND
J6.4 OL BCB on line – input (normally open): This pin will become active when the BCB port is connected
The connection between the BCB port and the BCB is shown in Figure 1-10.
电池开关
BCB
J10
OL
GND
FB
DRV
Aux-N.O.
Aux-N.O.
Figure 1-10 Connection between BCB port and BCB
1.7.3 Maintenance Bypass Switch And Output Switch State Port
J9 is the maintenance bypass switch and output switch state port. The port is shown in Figure 1-8 and described in
Table 1-7.
Figure 1-11 Maintenance bypass switch and output switch state port
Table 1-7 Description of maintenance bypass switch and output switch state port
Position Name Description
J9.2 IN_S Maintenance bypass switch state
J9.3 EXT_OUT
Output switch state
J9.4 GND Power GND
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 48 49

Comments to this Manuals

No comments