Emerson VSG & VSSG Installation Manual Page 77

  • Download
  • Add to my manuals
  • Print
  • Page
    / 106
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 76
5 – 19
VSG/VSSG • Installation, Operation and Maintenance Manual •Vilter/Emerson • 35391SSG
Gate Rotor and Support Clearance
When measuring, push the gate rotor against the pin to
remove oat.
1. Place a straight edge along the side of the gate ro-
tor, see Figure 5-16.
2. Measure the gap from the straight edge to the peak
of the gate rotor support. For minimum distance,
see Figure 5-15.
3. Repeat steps 1 to 2 to check gap along entire gate
rotor edge on both sides.
Section 5 • Maintenance/Service
Figure 5-15. Gate Rotor and Support Clearance - Minimum Clearances
Page view 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 105 106

Comments to this Manuals

No comments