EZR
B19
INSTALLATION
The regulator is installed on horizontal pipeline. Version with
slam shut, the release relay is situated towards the bottom (see
schematic).
Installation according to EN12186 recommended.
Install according to direction of fluid flow (arrow).
When assembling with adjacent elements care must be taken
not to create pressure force on the body and the assembling
elements (bolts, O-rings, flanges) should be compatible with
the geometry and working conditions of the equipment.
If the case arises a support must be used to avoid pressure
force on the body (a support can be installed under the
flanges).
Version with integral slam shut , connect the safety
manometric box (IS) to the impulse at 4D on a straight run of
the outlet pipe.
It is recommended to separate the slam shut impulse line (IS)
from that of the pilot (IP). Do not connect the impulses on the
lower generator line.
It is recommended to install an isolation valve and an
atmospheric valve, which can be useful for slam shut tripping
and verifications.
No modification should be made to the structure of the
equipment (drilling, grinding, soldering...).
It is recommended to install a servicing valve on the outlet
pipeline to facilitate adjustments and bleeding off to the
atmosphere.
Verify that the inlet side is protected by an appropriate
device(s) to avoid exceeding the limits of utilization (PS, TS).
Verify that the limits of utilization correspond to the appropri-
ate operating conditions.
Version with integral slam shut, verify that the safety
manometric box (BMS) and spring correspond to the appro-
priate operating conditions on the outlet side of the regulator.
The equipment should not receive any type of shock, espe-
cially the release relay.
The user should verify or carry out a protection adapted to the
environment.
Fire, seismic and lightening are not taken into consideration
in standard regulators. If required, a special product selection
and/or specific calculations may be supplied according to
specific requirements.
Version without integral slam shut, verify that a pressure
limiting device on the outlet side of the regulator guarantees a
pressure limit inferior or equal to the pilot PS.
All interventions on the equipment should only be performed by
qualified and trained personnel.
!
WARNING
!