Emerson EZR Series Pressure Reducing Regulator Instruction Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 11
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
10
EZR
MAINTENANCE
DISASSEMBLY
Recommended frequency:
Every 2 to 6 years (or less depending on operating conditions)
Verification:
Condition of O-rings, diaphragms, lubrication
Replacement:
O-rings, diaphragm
Tools:
Dimensions according to tables below
PRELIMINARY OPERATIONS
Valve plug closed
Inlet and outlet valves closed
Bleed off outlet pressure
Bleed off inlet pressure
Unscrew the pilot impulse connection
Unscrew the screws 1 fixing the bonnet 2
Remove the bonnet 2
Remove the diaphragm/plug assembly 3
Remove the slotted cage 4, the O-ring 5, the strainer 6
(or the space washer 6)
Clean parts and replace them if necessary
PILOT
Unscrew the manometric box screws
Remove the diaphragm
SLAM SHUT (Version with slam shut)
Unscrew the BMS impulse line connector (IS)
Remove the BM cover 7
Unscrew the BM fixing screw 8
Remove the holding pin 10
Remove the BM 9
Unscrew the screws 11 from the connecting part 12
Remove the connecting part 12
Remove the spring 13 and the valve plug 14
Unscrew the bypass 15
Unscrew the screws CHC 16 (DN 100 and 150)
Removing the orifice 17 (not recommended) requires a special extraction tool
REASSEMBLY
Perform the above operations in reverse order (respect tightening torques)
Replace the O-rings and diaphragm at each disassembly
SLAM SHUT REASSEMBLY (Version with slam shut)
The valve plug should be held in an upper position using a packing
gland and a box to facilitate reassembly
Precaution must be taken concerning the passage of the valve plug
over the segments
Lubricate screws before tightening
Lightly lubricate the O-rings (silicone grease) except for the valve
plug O-ring
Lightly lubricate the stem (silicone grease)
Lubricate the release relay mechanism (yoke and bolt)
(molybdenum graphite grease)
Lubricate the BMS spring (molybdenum graphite grease)
A special tool is required for reassembling a new orifice
B24
Body DN
Screws
Spanner
Items 1 and 11
(inches)
25 (1'') 9/16 - 12 x 1 3/4 13/16
50 (2'') 1/2 - 13 x 1 1/2 3/4
80 (3'') 5/8 - 11 x 1 3/4 15/16
100 (4'') 3/4 - 10 x 2 1/4 1 1/8
150 (6'') 1 - 8 x 2 3/4 1 1/2
B25a
Torque N.m.
Body DN Screw Fixation Connector Bypass
Item 1 & 11 Item 18 Item 19 Item 15
25 (1'') 110 8 130 14
50 (2'') 110 9 130 14
80 (3'') 175 28 280 20
100 (4'') 260 28 280 24
150 (6'') 510 70 410 24
B25b
Europe, Middle East, and Africa Document Only
Page view 9
1 2 ... 5 6 7 8 9 10 11

Comments to this Manuals

No comments