Emerson Liebert GXT3 User Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
Installation
9
2.0 INSTALLATION
2.1 Unpacking and Inspection
Unpack the UPS and conduct the following checks:
Inspect the UPS for shipping damage. If any shipping damage is found, report it to the carrier and
your local dealer or Emerson representative immediately.
Check the accessories against the delivery list. If there is any discrepancy, contact your local
dealer or your Emerson representative immediately.
2.2 What’s Included
With GXT3 UPS
Terminal Block Communication terminals
Compact Disk with:
Liebert MultiLink
®
Configuration Program
User Manual
USB Cable: one, 2m (6-1/2 ft.) long
Mounting hardware, including screws and handles
Plastic tower stand sets: 2 (four pieces)
Warnings, Safety Instructions booklet and WEEE recycling sheet (ISO 14001 compliance)
for 700VA - 1500VA: (2) 10A IEC C13 C14 Output Cable, 2m (6-1/2 ft.) long
for 2000VA - 3000VA:
(3) 10A IEC C13 C14 Output Cable, 2m (6-1/2 ft.) long
(1) CEE 7/7 (Schuko) to IEC C20 Input Cable, 2.5m (8-1/5 ft.) long
(1) BS1363 (UK) to IEC C20 Input Cable, 2.5m (8-1/5 ft.) long
2.3 Preparation for Installation
2.3.1 Installation Environment
Install the UPS indoors in a controlled environment, where it cannot be accidentally turned Off.
The installation environment should meet the specifications in 9.0 - Specifications.
Place the UPS in an area where airflow around the unit is unrestricted and away from water,
flammable liquids, gases, corrosives and conductive contaminants. Avoid direct sunlight.
Installation Clearances
Maintain a clearance of at least 100mm (4 inches) in the front and rear of the Liebert GXT3. Do not
obstruct the air inlets on the front panel and rear panel of the UPS; blocking the air inlets reduces
ventilation and heat dissipation, shortening the service life of the Liebert GXT3.
NOTE
The GXT3 External Battery Cabinet shipping package includes one battery cabinet, two
spacers for tower configuration and one DC power cable.
NOTE
Operating the Liebert
®
GXT3
in temperatures above 25°C (77°F) reduces battery life.
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 45 46

Comments to this Manuals

No comments