
Installation
Liebert
®
APS
™
MBC 8
Figure 6 Installing the cage nuts
3. Using the hook on the rear flange of the rack-mount rail, clip it onto the rear vertical pole and use
the provided four M6 x 16 screws to secure them, as shown in Figure 7.
Figure 7 Attaching the rear of the rack-mount rail kit
4. Using the provided four M6 x 16 screws, secure the front of the rack-mount rails onto the vertical
pole, as shown in Figure 8.
Vertical Rail
Cage Nut, 12
Rear Vertical Rail
Guide Rail
Hook
Installation Hole,
2 Places
M6 x 16 Screws, 4
Comments to this Manuals