Inspection and Unpacking
8
3.2.1 Handling the Unit While it is Packaged
Figure 7 Recommended unit handling equipment
If possible, transport the packaged Liebert CRV using a forklift or pallet jack; otherwise, use a
crane with slings and spreader bars.
If using a fork lift or pallet jack, make sure the forks (if adjustable) are spread to the widest allow-
able distance that fits under the pallet. Make sure the fork length is suitable for the unit length.
When moving the packaged unit with a forklift or pallet jack, lift the unit from either end of the
pallet.
When handling the packaged Liebert CRV with a forklift or pallet jack, do not lift it any higher
than 2" to 4" (51mm to 102mm) off the ground. Any personnel not directly involved in lifting the
unit must be at least 12 ft (3.7m) from the unit.
Exercise great care if the unit must be lifted higher than 4" (102mm); any personnel not directly
involved in lifting the unit must be at least 20 ft (5 m) away from the unit.
3.3 Unpacking the Liebert CRV
1. Remove the exterior stretch wrap packaging material from the unit, exposing the protective
corner and side packaging planks.
2. Remove the corner and side packaging planks from the unit, exposing the bag over the unit. The
bag may remain in place for dust and panel protection, or removed for immediate unit
installation.
3. Remove the bag when ready to install the unit.
Figure 8 Unpacking the Liebert CRV
Spreader Bars and Slings
Piano Jacks
Pallet
Jack
Forklift
Step 1 Step 2 Step 3